| Columbia Regional Wastewater Treatment Plant, Phase I Improvements
City of Columbia
$ 54,000,000
This plant expansion includes the addition of 4 clarifiers, 2 aeration basins, 2 pump stations, a grit facility, dewatering and blower buildings, and renovation of existing systems, to increase plant capacity from 13 MGD to 26 MGD.
Completion Date: January 2013 |
|
|
| Training Barracks Upgrade at Fort Leonard Wood
Army Corps of Engineers
$ 21,800,000
KCI is teamed with International Architects Atelier for this design-build project including remodel and addition to three 3-story dormitories, renovation of a dining hall and battalion headquarters.
Completion Date: July 2011 |
|
|
Seismic Retrofit of the Daniel Boone Expressway Bridge
MoDOT
$ 26,250,000
This project involves a three-stage retrofit of elevated section of I-64 from 9th Street to 14th Street in downtown St. Louis, involving 60' deep drilled pier foundations and steel reinforcement of column bents and bridge structure, as well as repainting the existing bridge structure.
Completion Date: September 2011 |

|
|
| Page-Olive Connector
St. Louis County Highway Department
$ 51,995,000
KCI partnered with Jacobs for this design-build project to construct the 21.5 mile Highway 141 extention from Olive north to Page Avenue in St. Louis County.
Completion Date: July 2012 |
|
|
|
|
|
| |
|